தமிழ்
සිංහල
Written by Zulfick Farzan
03 Dec, 2021 | 2:16 pm
COLOMBO (News 1st); The Ministry of Power announced that an issue on the transmission system from Kothmale to Biyagama was the cause of the Island-wide blackout on Friday (3).
The CEB General Manager said it would take several hours to restore the supply of power.
In the meantime, the blackout has also resulted in water cut to Colombo and suburbs.
Sri Lanka Railways also announced that its operations from Fort, Colombo will be delayed due to the power cut.
24 Jun, 2022 | 09:15 PM
24 Jun, 2022 | 07:01 PM
Are you interested in advertising on our website or video channel
Please contact us at [email protected]
News 1st, MTV Channel (Pvt) Ltd, MBC Networks (Pvt) Ltd, 45/3, Braybrooke Street, Colombo-02.
T.P : +94 114 792 700, Fax : +94 114 792 733
[email protected]
Copyright © 2019 MTV Channel (Pvt) Ltd | Web Design by 3CS
T.P : +94 114 792 700
Fax : +94 114 792 733
[email protected]
Copyright © 2019 MTV Channel (Pvt) Ltd
Terms of Use |
News Archive |
About Us
RSS
Web Design by 3CS